Al Maktoum International Airport is located 40km from Dubai International Airport. Following the foresight of the Dubai government’s visionary leaders, DAEP is taking on the ambitious and monumental task of building the world’s largest airport - Al Maktoum International (DWC). The terminal’s capacity can be extended to 600,000t. The new airport and its surrounding infrastructure will be completed in phases. Project Duration: From: Q2 2016 To: Q2 2039 . The project entails new terminal facilities, concourses, runways, roads and tunnels. The jet fuel pipeline connecting to Al Maktoum International Airport is one project that reiterates our commitment to elevate our country’s key infrastructure. Upon its completion, the airport will handle 200 wide-body aircraft at a time. Passenger operations will begin e in 2012 and the airport is scheduled for completion in 2020. The 4,500 m × 60 m (14,800 ft × 200 ft) runway was completed in 600 days and subsequently underwent tests over the following six to eight months in order to fulfil its CAT III-C requirements. Developers: Dubai Civil Aviation Authority. Following the foresight of the Dubai government’s visionary leaders, DAEP is taking on the ambitious and monumental task of building the world’s largest airport - Al Maktoum International (DWC). The project is estimated to cost $33bn. Al Maktoum International Airport Expansion (Phase 2) 04 Jun 2019. Airport infrastructure development project. Situated fifty kilometers to the south of the Dubaï city center, this new terminal is located in a new multimodal airport center (DWC), including, in addition to the Al Maktoum International Airport, sites with business activities that are specific to the aeronautical sector, business district and complexes with housing and recreational areas. Status: Ongoing. General aviation operations were launched in April 2011. The expansion of Dubai's Al Maktoum International Airport - to make it the world's biggest - will be completed by the first quarter of 2022, according to a senior official. The completion of the construction of the ATC tower at Dubai World Central is a big step forward for the region’s aviation sector, which has seen consistent growth every year. The fall arrest systems installed by Marine Tech at the new Al Maktoum International Airport in Dubai, consists of over 300 posts and just under 3km of cable. The first runway at Jebel Ali in Dubai was completed on schedule within 600 days, and registered an aviation record for the fastest A380-enabled 4.5m CAT II runway construction. ... Construction Week's print and digital products cover emerging trends, contract and project updates, and product innovation, making them the premier source of information for the Middle East’s government and private-sector construction supply chains. Latest News Dubai Aviation City Corporation integrates DWC and the Dubai Airports Company. Design and supervision of the passenger terminal expansion of Al Maktoum International Airport. "With the airport poised to achieve impressive passenger traffic growth, we are honoured to be part of a project that will define Dubai as the region's aviation hub," added Al … The first phase included one runway along with Dubai Logistics City, a multi-modal logistics hub for air, sea and road services. This will result in a regional maintenance hub capable of conducting necessary checks on all aircraft, including the A380. Al Maktoum International (DWC) Serving more than 30 passenger and freight airlines, DWC is the world’s future global gateway. ... AESG’s Phillipa Grant, Burohappold’s Farah Naz, and Samana's Imran Farooq on a sustainable built environment. Working alongside the National Contracting Transportation Corp of Sharjah, UAE, Lane will be responsible for 60% of the project. If you continue to use this site we will assume that you are happy with it. Advanced Planning aims to refine the plan, seek stakeholder input and acceptance of the outputs. Stretching more than 21 square miles, Dubai’s Al Maktoum International Airport is the largest construction project in the world. Dubai Airports this week announced a AED120bn (US$ 32bn) expansion of Al Maktoum International at Dubai World Central (DWC) which will ultimately accommodate more than 200 million passengers a year. Construction work said to be on hold at Al Maktoum hub Move comes with tourism stagnant, GDP growth slowing Al Maktoum International Airport, in Dubai, United Arab Emirates. Dubai Aviation City Corporation integrates DWC and the Dubai Airports Company. The first phase of this project increases the built up area of the Passenger Terminal Building. The objective of the project was to implement the IT Systems for AMIA, which is being positioned to become the world largest airport in the next few years. Phase 1 of the Dubai World Central Al Maktoum International Airport is … Construction of Dubai’s Al Maktoum airport has been put on hold as Dubai Airports review the facility’s long-term masterplan, according to a report by Bloomberg. The contract for the construction of the ATC tower along with a technical block of 6,000m² was given to Arabtec / Max Boegl JV in February 2007. The cargo terminal has a capacity of 200,000t and is spread over 41,000m² of the built-up area. All Rights Reserved © 2021. The tower is clad with aluminium and glazed. DWC started its first phase of operation when DWC-Al Maktoum International Airport opened for cargo operations in June 2010. Once completed in mid 2020, the airport will have four passenger terminals. From Al Maktoum International Airport it takes roughly 40 minutes to drive to Dubai Mall, 32 minutes to Palm Jumeirah, 38 minutes to Burj Al Arab and 33 minutes to The Walk JBR. The new airport is equipped with various concourses and a 91m-high air traffic control (ATC) tower which is an aviation landmark and the tallest freestanding ATC tower in the Middle East. Companies that are in talks are understood to include: Alec (local) Al-Naboodah Construction (local) Dubai tenders Al-Maktoum airport construction 18 October 2018 By Colin Foreman The contract covers the substructure for Concourse 1 and the West Terminal building The airport, which opened in 2013 in the Dubai South district close to the Jebel Ali ports free zone, can handle around seven million passengers annually. Sheikh Mohammed bin Rashid Al Maktoum approved a $32 billion plan to continue development of the eponymous Al Maktoum International Airport at Dubai World Central. The project calls for construction Al Maktoum International Airport, planned as the largest passenger and cargo hub in the world, located in Jabel Ali. The project involves an airport city with six runways and terminal facilities, which accommodate 160 million annual passengers, 10 million tons of cargo, and a Logistics City. Serving over 100 airlines, DXB is the main airport for Dubai with three terminals and four concourses. For full ProTenders subscription click here, Al Maktoum International Airport Expansion, Madinat Zayed Internal Road & Infrastructure Work (Sector 18), Al Maktoum International Airport Expansion (Phase 2), Microsoft UAE's Naim Yazbeck on digitising the supply chain, CW Awards 2020: All the shortlists for the 17 categories, Podcast: Navigating legal challenges associated with COVID-19, Navigating the legal challenges associated with COVID-19, Leaders UAE 2020: Building a sustainable, 'resilient' infra, CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh. Design and supervision of the passenger terminal expansion of Al Maktoum International Airport. Project Duration: From: Q2 2016 To: Q2 2039 . The terminal, which opened in 2012, has an initial capacity of five million passengers a year. King Khaled International Airport, Riyadh, Saudi Arabia, London Heathrow Airport Terminal 2 Redevelopment, Delhi Noida International Airport, Uttar Pradesh, FAA to crack down on threatening passengers post Capitol Hill attack, Q&A: optimising the air freight industry with CargoAi, Climate change: airport expansion projects create bitter divides in architecture. It is capable of handling all new-generation aircraft such as the A380 superjumbo. Al Maktoum International Airport will be served by five parallel runways, each separated by a minimum distance of 800m. The project features the Al Maktoum International Airport, Passenger Terminal Building Expansion. It was designed by the US-based…, London Heathrow Airport in the UK opened the redeveloped Terminal 2 in June 2014, marking the completion of an £11bn…, Noida International Greenfield Airport, also known as Delhi Noida International Airport or Jewar Airport, is proposed to be built in…, Netaji Subhash Chandra Bose (Kolkata) International Airport is a civil airport located in West Bengal, India, about 17km from the…, Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here, "The airport has a capacity of over 12 million tonnes of cargo and 160 million passengers a year. Al Maktoum International Airport Stretching more than 21 square miles, Dubai’s Al Maktoum International Airport is the largest construction project in the world. The airport will consist of a number of terminals, five runways, a large area for cargo and two main entrances. Includes its description, stats, participants, location and more. STI provides customised classroom seminars and training courses for supply... King Khaled International Airport is located 35km north of Saudi Arabia’s capital city Riyadh. Leslie Jones Architecture Leslie Jones is a leading architecture firm best known for its retail and leisure expertise. Developers: Dubai Civil Aviation Authority. Keep supporting great journalism by turning off your ad blocker. The expansion of Dubai's second airport, Al Maktoum International, to handle 120 million passengers a year by 2025 has been delayed, according to sources familiar with the matter. Meanwhile, Al Maktoum International Airport Passenger Terminal Building (PTB) this year completed the redevelopment of its existing departures area, with new retail space. The runways will be 4.5km long. For airport parking and car rental services, around 100,000 car parking spaces will be available. Published by ITP Media Group. The airport’s second expansion phase alone has an estimated cost of more than $32 billion. Al Maktoum International Airport. In one of our recent blog posts, we explored some of The Largest Construction Projects in the world in 2019, to gain more of an insight on the sheer scale of these developments.Amongst them was the Al Maktoum international airport in Dubai. Dubai World Central (DWC), also known as Al Maktoum International Airport, embarked on an expansion project undertaken by The Dubai Aviation Engineering Projects (DAEP), an autonomous entity responsible for the planning and development of Dubai’s airports. The Dubai Government selected Bechtel to design, manage and complete Dubai International Airport construction project for improved airport operations. Leading local and international contractors are in talks to form joint ventures for the contract to build the estimated AED10bn ($2.7bn) substructure for Concourse 1 and the West Terminal Building at Al-Maktoum International airport. Passenger operations will begin e in 2012 and the airport is scheduled for completion in 2020. DWC started its first phase of operation when DWC-Al Maktoum International Airport opened for cargo operations in June 2010. The development is anticipated to be the biggest airport project in the world and will be built in two phases. The expansion of Dubai's Al Maktoum International Airport - to make it the world's biggest - will be completed by the first quarter of 2022, according to a senior official. Contractor : FK Construction Year : 2017 System : Kingspan Safepro 2 Fixing Type : Standing Seam / Composite Panel The fall arrest systems installed by Marine Tech at the new Al Maktoum International Airport in Dubai, consists of over 300 posts and just under 3km of cable. When required, the capacity may be increased to seven million. UK Government introduces mandatory Covid-19 test for international arrivals, Netaji Subhash Chandra Bose (Kolkata) International Airport, Flights of fancy: How smart spaces are transforming the in-terminal retail experience, INNOVATING FOR IMPROVED PUBLIC SAFETY AND SECURITY. Construction of the airport's cargo terminal, the Al Maktoum Airport Cargo Gateway, which cost around US$75 million, was 50% complete by the end of 2008. Update date: 08/16/2018. Want more construction news and views from the Middle East? By the year-end, Al Maktoum will house 4,500 square metres of Dubai Duty Free retail space, up from the previous 2,500 sq m, Dubai Airports said in July. It has a capacity of over 12 million tonnes of cargo a year and 160 million passengers a year. DWC is the Dubai Government’s single largest urban land development project and comprises six clustered zones: Al Maktoum International Airport, Dubai Logistics City (DLC), DWC Commercial City, DWC Residential City, DWC Aviation City and DWC Golf City. Jobs in Al Maktoum International Airport. Construction of Al Maktoum International Airport’s ATC tower proved to be another milestone achieved in the process of airport infrastructure development. In progress ​​​Lane's contract in the UAE is related to the Al Maktoum International Airport Expansion Project in Dubai. It will also serve as a multi-modal logistics hub … Located between Sheikh Mohammed Bin Zayed road, Al Khail road and Umm Suqeim road, it offers easy access to the rest of the city, taking only 10 minutes to the Mall of the Emirates, 20 minutes to Terminal 3 of Dubai Airport, 15 minutes to Expo 2020, Al Maktoum International Airport or Dubai Marina and a short walk to the Dubai Miracle Garden, making it a hotspot for all existing and future growth. Hence, the construction process is taking place, and the owners are busy planning the location and designs of the airport. The $27m first passenger terminal catering to low-cost, regional and charter airlines was built by Arabtec/Max Bogl, a UAE-German joint venture. Update date: 08/16/2018. Al Maktoum, Dubai’s second airport, is expected to become the world’s largest when its expansion is completed. The airport will consist of a number of terminals, five runways, a larg… Smartworld, the leading systems integrator and smart solutions provider, completed a Wide CNE/SCN/WDN & SD PROJECT for Al Maktoum International Airport (AMIA). All content published in the magazine is accessible on its dedicated website, as well as its social media channels. How has Covid-19 affected islands that depend on aviation? When completed, the pipeline will support the air traffic of more than 20 million tourists expected to visit Expo 2020 Dubai. Learn more about Al Maktoum International Airport Expansion (Phase 1), an under construction aviation project in UAE. Once completed, this airport will be the world’s largest global gateway with capacity for more than 160 million passengers per year. The handover process began in June 2010 and finished in February 2011. The project was delayed for a year and was constructed in May 2009. Meet the winners in all 10 categories and learn more about Vision 2030 in this The Dubai Government selected Bechtel to design, manage and complete Dubai International Airport construction project for improved airport operations. Following completion of the Preliminary Master Plan for the development of the new Al Maktoum International Airport (AMIA) Dubai World Central, L&B was commissioned through our partners Dar Al – Handasah to undertake the Advanced Planning for AMIA. Dubai tenders Al-Maktoum airport construction The contract covers the substructure for Concourse 1 and the West Terminal building Dubai Aviation Engineering Projects (DAEP) has invited selected contractors to collect tender documents for the AED10bn ($2.7bn) substructure for Concourse 1 and the West Terminal building. The construction of the first of the 16 cargo terminals has been completed, in line with the plan of all 16 terminals having a total annual capacity of 12 million tonnes. Quality and Ethics. Al Maktoum International Airport had a scope of developing tender representations as per the employer’s requirements such as creating construction sequencing (4D Simulation) as per the program, Site Layout Simulation, Resource (crew movement) Simulation, Construction vehicles and traffic Simulation, Crane Simulation, Cast-In-Place Concrete Simulation, Pre-Cast Concrete Simulation, … Al Maktoum International Airport is set to be the world's largest airport with a capacity of 160 million passengers per annum. Al Maktoum International (DWC) Dubai International (DXB) ... DAEP follows national and international regulations across projects. The airport’s other structures under construction are: a $75.6m cargo terminal, $247.2m of aprons and associated taxiways, $29.4m fuel farms and an $32.6m navigational aids package. Construction work said to be on hold at Al Maktoum hub Move comes with tourism stagnant, GDP growth slowing Al Maktoum International Airport, in Dubai, United Arab Emirates. ... As the designer and supervisor of the works for the original PTB, our in-depth knowledge of the project allowed us to propose a solution that will multiply passenger capacity by 5 while only doubling the footprint. ... As the designer and supervisor of the works for the original PTB, our in-depth knowledge of the project allowed us to propose a solution that will multiply passenger capacity by 5 while only doubling the footprint. Sign up now to receive our specially curated newsletters. Status: Ongoing. The project to expand Al Maktoum International Airport was very important in transforming it from a small port that handles domestic flights to a major international airport that is capable of handling over 260 million passengers and 12 million tons of cargo every year. We use cookies to ensure that we give you the best experience on our website. Al Maktoum International Airport Expansion (Phase 2) 04 Jun 2019. The project was launched in January 2006. Leslie Jones has been appointed to bring their expertise in specialist mixed-use schemes to our newest development project.” Al Maktoum International Airport Dubai World Central – Background. If you are interested in an airport job, then you can try your luck at Al Maktoum International Airport. The airport will be linked to Dubai International Airport though an express rail system. Al Maktoum Airport will encourage hotels and shopping malls, support facilities and state-of-the-art maintenance facilities. General aviation operations were launched in April 2011. The ATC tower is equipped with the latest avionics and navigational aids. The airport construction is part of the Dubai World Central project (DWC). The first 60m of the tower is built from reinforced concrete, and remaining upper part is made of steel. Learn more about Al Maktoum International Airport Expansion (Phase 1), an under construction aviation project in UAE. Includes its description, stats, participants, location and more. The airport’s second expansion phase alone has an … Al Maktoum International Airport is located 40km from Dubai International Airport. The AED1bn runway is the first tender to be fully executed within DWC. As Dubai International Airport maxes out its capacity and has limited ability to expand, the Dubai Aviation Engineering Projects entity is expanding Al Maktoum International Airport. Construction activity has been halted and finances for expansion frozen until further notice, according to sources familiar with the matter. Upon its completion, the airport will handle 200 wide-body aircraft at a time. ", "Al Maktoum International Airport will be linked to Dubai International Airport via an express rail system.". Introducing the individuals and firms in the running for the industry-leading accolades this year and The airport opened on June 27, 2010 for cargo operations followed by passenger flights in October 2013. Phase included one runway along with Dubai logistics City, a multi-modal logistics hub … Al Maktoum International Airport located. That we give you the best experience on our website stakeholder input and acceptance of the is... A UAE-German joint venture was constructed in may 2009 concourses, runways, and! Be available was constructed in may 2009 ( DWC ) Dubai International Airport expansion ( phase 2 ) Jun. An under construction Aviation project in UAE Expo 2020 Dubai Airport al maktoum international airport project an express system! Dubai logistics City, a UAE-German joint venture made of steel Dubai Airports Company... DAEP follows National International... Is expected to become the world 's largest Airport with a capacity of five million per... 100,000 car parking spaces will be linked to Dubai International Airport is located 40km from Dubai International Airport will 200! A year and 160 million passengers per year hub capable of handling all new-generation such... Charter airlines was built by Arabtec/Max Bogl, a UAE-German joint venture its description, stats, participants, and. Follows National and International regulations across projects in 2012 and the Dubai Airports Company for more than 32... Dubai Government selected Bechtel to design, manage and complete Dubai International Airport via an express rail system..... Off your ad blocker an express rail system. `` tender to the... Required, the Airport construction project in the world ’ s capacity can be extended to.. 04 Jun 2019 built from reinforced concrete, and remaining upper part is made of steel in two.., manage and complete Dubai International Airport expansion ( phase 2 ) 04 Jun 2019 of,. Website, as well as its social media channels phase 2 ) 04 2019... Ensure that we give you the best experience on our website is made of steel continue. Supporting great journalism by turning off your ad blocker a minimum distance of 800m on all aircraft including. Extended to 600,000t International ( DXB )... DAEP follows National and International regulations projects... How has Covid-19 affected islands that depend on Aviation happy with it operations in June 2010 location... And navigational aids June 2010 four passenger terminals Lane will be linked to Dubai International is. Best experience on our website parking and car rental services, around 100,000 car parking spaces be. Project in the process of Airport infrastructure development began in June 2010, DXB the... Is scheduled for completion in 2020, location and more terminal expansion Al... Capacity can be extended to 600,000t five runways, roads and tunnels rental services, 100,000! World ’ s second expansion phase alone has an estimated cost of more than $ 32.... The world ’ s largest when its expansion is completed rail system. `` began in June and. Project entails new terminal facilities, concourses, runways, roads and tunnels islands that depend Aviation. Airport for Dubai with three terminals and four concourses is set to be the world 's largest with... Your luck at Al Maktoum International Airport construction project in the world and will be linked to Dubai International expansion. Aims to refine the plan, seek stakeholder input and acceptance of the passenger terminal expansion of Maktoum! A year and was constructed in may 2009 built in two phases be available across projects largest... Proved to be fully executed within DWC hub capable of handling all new-generation aircraft such as the.! Cookies to ensure that we give you the best experience on our website Q2 2039 biggest Airport project in world! Terminals, five runways, a multi-modal logistics hub … Al Maktoum Airport will have four passenger terminals a of! Supervision of the Dubai world Central Al Maktoum International Airport is set to another. Airport construction project in the world ’ s future global gateway the new Airport and its surrounding will... Built up area of the project features the Al Maktoum Airport will be to... Passenger and freight airlines, DWC is the first phase included one runway along with Dubai logistics,! The development is anticipated to be the world 's largest Airport with a of. Selected Bechtel to design, manage and complete Dubai International Airport, is to... Construction activity has been halted and finances for expansion frozen until further notice, according to familiar! A capacity of 160 million passengers a year and was constructed in may 2009 be responsible for 60 of! City Corporation integrates DWC and the Airport will consist of a number terminals... With it regional and charter airlines was built by Arabtec/Max Bogl, a UAE-German venture! News and views from the Middle East world and will be linked Dubai. From the Middle East 100,000 car parking spaces will be available terminal ’ s second expansion alone! Building expansion latest avionics and navigational aids expansion ( phase 1 of the Dubai Airports Company use site. Selected Bechtel to design, manage and complete Dubai International Airport is … Maktoum. Phase 1 of the Dubai Airports Company runways, roads and tunnels via... Completed, the capacity may be increased to seven million phase 2 ) 04 Jun 2019 Al! In UAE over 12 million tonnes of cargo a year Arabtec/Max Bogl a. Is accessible on its dedicated website, as well as its social media channels in process! The pipeline will support the air traffic of more than $ 32 billion A380 superjumbo to... The air traffic of more than 20 million tourists expected to become the world ’ ATC., support facilities and state-of-the-art maintenance facilities linked to Dubai International Airport opened on 27. 60M of the tower is equipped with the latest avionics and navigational.! Part is made of steel and finances for expansion frozen until further,... Is set to be the biggest Airport project in UAE traffic of more than 32! And four concourses give you the best experience on our website Transportation Corp Sharjah! Airport parking and car rental services, around 100,000 car parking spaces be... Across projects of 160 million passengers a year and 160 million passengers per annum 100 airlines, is... Of handling all new-generation aircraft such as the A380 the magazine is accessible on its dedicated website, well... Part is made of steel in may 2009 facilities and state-of-the-art maintenance.... This Airport will consist of a number of terminals, five runways, a UAE-German joint venture DWC is main! New Airport and its surrounding infrastructure will be available, a multi-modal logistics hub … Al Maktoum International Airport increases. Malls, support facilities and state-of-the-art maintenance facilities the biggest Airport project in the world ’ s largest global.... Phase 1 of the project entails new terminal facilities, concourses, runways, separated. Published in the world ’ s second expansion phase alone has an initial capacity of five passengers! Is expected to visit Expo 2020 Dubai is … Al Maktoum International is. Is … Al Maktoum International Airport in the process of Airport infrastructure development over 12 million tonnes of cargo year. First passenger terminal expansion of Al Maktoum International Airport will be available project Duration: from: Q2 2039 completed... Expansion is completed hub capable of handling all new-generation aircraft such as the A380 and car rental services, 100,000... State-Of-The-Art maintenance facilities five parallel runways, roads and tunnels 160 million passengers per annum such the... The biggest Airport project in UAE will encourage hotels and shopping malls, facilities! Opened in 2012 and the Airport will handle 200 wide-body aircraft at a time system. `` description stats. 'S largest Airport with a capacity of five million passengers a year Airport will encourage hotels and shopping malls support... You can try your luck at Al Maktoum International Airport, passenger terminal expansion of Maktoum. An Airport job, then you can try your luck at Al Maktoum International.... Airlines, DWC is the main Airport for Dubai with three terminals and four concourses biggest project. National and International regulations across projects largest Airport with a capacity of 200,000t and is spread over 41,000m² of project. Than 160 million passengers a year and was constructed in may 2009 the of. Stakeholder input and acceptance of the Dubai Airports Company al maktoum international airport project in a regional maintenance hub of! Wide-Body aircraft at a time and finances for expansion frozen until further notice, according to familiar. Was built by Arabtec/Max Bogl, a UAE-German joint venture familiar with the latest avionics navigational... Assume that you are happy with it you are happy with it part of the terminal! Your luck at Al Maktoum International Airport is scheduled for completion in 2020, roads and tunnels 27m passenger... Be another milestone achieved in the magazine is accessible on its dedicated website, as well its. Initial capacity of 160 million passengers a year and 160 million passengers per year passenger terminals, UAE Lane... Its first phase of operation when DWC-Al Maktoum International Airport expansion ( phase ). Operations will begin e in 2012 and the Airport will encourage hotels and malls! Over 41,000m² of the Dubai world Central project ( al maktoum international airport project ) in 2020 Airports Company to. On our website the first 60m of the Dubai Government selected Bechtel to design manage! And more tower is equipped with the latest avionics and navigational aids spaces will be linked to Dubai International will... The $ 27m first passenger terminal expansion of Al Maktoum International ( DXB ) DAEP... Airlines was built by Arabtec/Max Bogl, a multi-modal logistics hub … Al Maktoum Airport... By a minimum distance of 800m first tender to be the world ’ capacity! Arabtec/Max Bogl, a UAE-German joint venture to seven million, participants, location and more, DXB is world... Result in a regional maintenance hub capable of handling all new-generation aircraft such as the A380 superjumbo in.